CIP - FY 2025-29 FINAL - Flipbook - Page 225
Capital Improvement Plan
CITY OF EUSTIS
CAPITAL PROJECT/EQUIPMENT REQUEST - FIVE YEAR CIP (>$25,000)
FORM F-300
DEPARTMENT: Water
(1) PROJECT NAME: WATER / MAGNOLIA AVE GALVANIZED MAIN
PROJECT STATUS: Existing in Edmunds
Water Capital Projects - 8600
PROGRAM:
ACCT1#:
042-8600-533-66-02
ACCT2#:
ACCT3#:
PROJECT ADDITIONS/CHANGES JUSTIFICATION:
(2) PROJECT DESCRIPTION AND JUSTIFICATION:
Replace approx. 2300’ of 2” galvanized water main with 6” PVC between Mary and
Kensington. Adding fire hydrants, improving the quality and volume of water per the galvanized pipe replacement plan. The construction will be open trench and directional bore.
Moved the project back Engineering will be in FY 27/28. $50,000 was
added to cover the cost of a survey from an outside company 2024.
(3) PURPOSE OF PROJECT:
Extend life of existing infrastructure
X
Replace existing infrastructure
Expand infrastructure
Replace existing vehicles or equipment
Add new equipment or vehicles
Capital improvements
Strategic plan /comprehensive plan bonus
(4) ESTIMATED COST BY YEAR:
Current Year
23/24
a.
b.
c.
d.
e.
f.
g.
h.
i.
Land Acquisition
Planning
Design
Architecture/Engineering
Site Development/Construction
Equipment,Vehicles, Etc
Contingency
Other
Project Additions/Changes
TOTAL
(5) PRIORITY:
FY 25/26
FY 24/25
FY 26/27
FY 27/28
-
-
-
-
50,000
-
-
-
-
50,000
100,000
FY 28/29
TOTAL
-
Timetable
50,000
50,000
100,000
safety concern, hazardous condition, agency compliance, non-functional, etc
First Year
highly visible, benefit outweighs cost over short period, economic
return on investment
development potential
1 - 3 Years out
b.
2 - 5 Years out
c. X service level mainten.
maintains City desired level of service
service level improvm.
new or improved service to meet demand
As Budget Allows
d.
(6) EFFECTS ON ANNUAL OPERATING BUDGET:
YEARS
Current Year
FY 25/26
FY 26/27
FY 27/28
FY28/29
2030-2034
TOTAL
FY 24/25
23/24
Change in Fuel Costs
Change in Utility Costs
Change in Maintenance
Costs
(7) PROPOSED FUNDING SOURCE(S):
(9) PROJECT OR EQUIP LOCATION:
Magnolia Ave.
1) Water & Sewer R&R Fund 042
2)
3)
(7a) POTENTIAL GRANT FUNDING SOURCE IF APPLICABLE: (List source and matching requirements)
N/A
a.
risk
(8) PROJECT LEAD NAME & CONTACT INFO (ADDITIONAL PROJECT INFO AS NEEDED)
Greg Dobbins - Director of Utilities
213
-