Capital Improvement Plan
CITY OF EUSTIS
CAPITAL PROJECT/EQUIPMENT REQUEST - FIVE YEAR CIP (>$25,000)
FORM F-300
DEPARTMENT: Wastewater
(1) PROJECT NAME: SEWER / CR 44 FORCE MAIN
PROJECT STATUS: Project in process
Sewer Capital Projects - 8600
PROGRAM:
ACCT1#:
042-8600-535-66-16
ACCT2#:
ACCT3#:
PROJECT ADDITIONS/CHANGES JUSTIFICATION:
(2) PROJECT DESCRIPTION AND JUSTIFICATION:
This project will replace 4000’ of 8” PVC force main with 10” HDPE from L.S. #24 to CR 44
and Hicks Ditch Rd. This will include plug valves and air release valves. The construction
method will be by the directional bore.
Moved from 25/26 to 24/25 and rasied from $380,000 to $420,000 to
cover the cost of upsizing the HDPE pipe size and addition bypass
piping.
(3) PURPOSE OF PROJECT:
Extend life of existing infrastructure
X
Replace existing infrastructure
Expand infrastructure
Replace existing vehicles or equipment
Add new equipment or vehicles
Capital improvements
Strategic plan /comprehensive plan bonus
(4) ESTIMATED COST BY YEAR:
Current Year
23/24
a.
b.
c.
d.
e.
f.
g.
h.
i.
Land Acquisition
Planning
Design
Architecture/Engineering
Site Development/Construction
Equipment,Vehicles, Etc
Contingency
Other
Project Additions/Changes
TOTAL
(5) PRIORITY:
FY 25/26
FY 24/25
FY 26/27
FY 27/28
FY 28/29
TOTAL
50,000
-
-
-
-
-
-
-
380,000
-
-
-
50,000
420,000
420,000
(380,000)
-
-
-
Timetable
50,000
380,000
40,000
470,000
safety concern, hazardous condition, agency compliance, non-functional, etc
First Year
highly visible, benefit outweighs cost over short period, economic
return on investment
development potential
1 - 3 Years out
b.
2 - 5 Years out
c. X service level mainten.
maintains City desired level of service
service level improvm.
new or improved service to meet demand
As Budget Allows
d.
(6) EFFECTS ON ANNUAL OPERATING BUDGET:
YEARS
Current Year
FY 25/26
FY 26/27
FY 27/28
FY28/29
2030-2034
TOTAL
FY 24/25
23/24
Change in Fuel Costs
Change in Utility Costs
Change in Maintenance
Costs
(7) PROPOSED FUNDING SOURCE(S):
(9) PROJECT OR EQUIP LOCATION:
CR 44
1) Water & Sewer R&R Fund 042
2)
3)
(7a) POTENTIAL GRANT FUNDING SOURCE IF APPLICABLE: (List source and matching requirements)
N/A
a.
risk
(8) PROJECT LEAD NAME & CONTACT INFO (ADDITIONAL PROJECT INFO AS NEEDED)
Greg Dobbins - Director of Utilities
255
-