CIP FY 26-30 Final - Flipbook - Page 176
CITY OF EUSTIS
CAPITAL PROJECT/EQUIPMENT REQUEST - FIVE YEAR CIP (>$25,000)
FORM F-300
DEPT / FUND
042 - Water/Sewer Rev Fund
PROGRAM: 8600 - Projects
PROJECT NAME:
PROJECT STATUS:
Sewer / Floating Solar Panel
Multi-year in Progress
ACCT1#:
ACCT2#:
ACCT3#:
PROJECT DESCRIPTION AND JUSTIFICATION:
042-8600-535-66-10
PROJECT ADDITIONS / CHANGES JUSTIFICATION
Installation of floating solar panels on the west reclaim pond at the
Eastern WWTP. The project will connect to the electrical systems
for the Eastern WWTP, Eastern WTP and the Sprayfield Pumping
Station. Some funding may be obtained through the Inflation
Reduction Act of 2022. The payback period is currently calculated
at 9.7 years.
PURPOSE OF PROJECT:
Extend life of existing infrastructure
Replace existing infrastructure
Expand infrastructure
Software as a Service agreement
Replace existing vehicles or equipment
New vehicles or equipment
Capital improvements
Strategic plan /comp plan bonus
x
ESTIMATED COST BY YEAR:
Current Year
FY 24/25
Land Acquisition
Planning
Design
Architecture/Engineering
Site Development/Construction
Equipment,Vehicles, Etc
Contingency
Other
Project Additions/Changes
FY 25/26
FY 26/27
FY 27/28
FY 28/29
-
-
1,500,000
-
-
-
-
1,500,000
-
-
1,500,000
-
1,500,000
Timetable
First Year
1 - 3 Years out
2 - 5 Years out
As Budget Allows
PRIORITY:
x
-
-
TOTAL
Risk
Return on Investment
Service Level Maintenance
Service Level Improvement
5 YR
TOTAL
FY 29/30
Safety concern, hazardous condition, compliance, non-functional, etc
Highly visible, benefit outweighs cost over short period, economic development
Maintains City desired level of service
New or improved service to meet demand
EFFECTS ON ANNUAL OPERATING BUDGET:
Current Year
Change - Fuel Costs
Change - Utility Costs
Change - Maintenance Costs
FY 25/26
-
FY 26/27
-
PROPOSED FUNDING SOURCE(S):
FY 27/28
-
FY 28/29
-
-
PROJECT OR EQUIP LOCATION:
1) 042 - Water/Sewer Rev Fund
2)
3)
Eastern Reclaim Pond
POTENTIAL GRANT FUNDING SOURCE IF APPLICABLE: (List source and matching requirements)
PROJECT LEAD NAME & CONTACT INFO (ADDITIONAL PROJECT INFO AS NEEDED)
Greg Dobbins - Deputy Director PU
172
5 YR
TOTAL
FY 29/30
-
-